What does this mean?

The output of the show frame-relay pvc command shows “PVC STATUS = INACTIVE”. What does this mean?
A. The PVC is configured correctly and is operating normally, but no data packets have been detected for more than five minutes.
B. The PVC is configured correctly, is operating normally, and is no longer actively seeking the address of the remote router.
C. The PVC is configured correctly, is operating normally, and is waiting for interesting traffic to trigger a call to the remote router.
D. The PVC is configured correctly on the local switch, but there is a problem on the remote end of the PVC.
E. The PVC is not configured on the local switch.

Pass Cisco CCNA 200-301 Exam in First Attempt

FULL Printable PDF and Software. VALID exam to help you pass.

cisco-exams

Leave a Reply

Your email address will not be published.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.